Per switchgear, acoustic and TEV detection, with PRPD analysis. Per outer switchgear grounding, which is sometimes/often common, in depth PD analysis using unique PD extraction method through HFCT and algorithm to get sub-noise PD. Clustering. PRDR. Determination of origin and nature of PD (Surface, internal, corona). Determination of risk level.
IF possible: analysis through cable grounding 3 phases.
Including 1 equipment & transport. Optimized positions to be measured Independent (no sync) measurement Recommended as first approach for periodic maintenance.
Price per switchgear.
Per switchgear, acoustic and TEV detection, with PRPD analysis. Per outer switchgear grounding, which is sometimes/often common, in depth PD analysis using unique PD extraction method through HFCT and algorithm to get sub-noise PD. Clustering. PRDR. Determination of origin and nature of PD (Surface, internal, corona). Determination of risk level.
IF possible: analysis through cable grounding 3 phases.
Including 1 equipment & transport. Optimized positions to be measured Independent (no sync) measurement Recommended as first approach for periodic maintenance