per cable 3 phases
Including 2 equipment, synchronizer and localisation
Excluding transport
L < 6km
Sync measurements at each cable
Recommended if grid is supposed to have problems and want to localize
Description per cable 3 phases
Including 2 equipment, synchronizer and localisation
Excluding transport
L < 6km
Sync measurements at each cable
Recommended if grid is supposed to have problems and want to localize